This morning, the road crew was able to get our 550 (1 ton) truck repaired and ready to go.
In addition, as of about noon today, they replaced the water pump in the Mack truck (one of our larger plow trucks), so it also is back up and on the road.
A Bristol truck came up this morning to assist with sanding some of our roads. The roads had never dried out after the storm, and with the colder weather, were icing up. Thanks to the Bristol crew for their assistance while our trucks were down.