Covered Bridge Road

Covered Bridge Road will be closed at the town line (around 75 Covered Bridge Road) on Thursday, November 14 from 8AM – 3PM for a culvert replacement.

This entry was posted in Uncategorized. Bookmark the permalink.

Comments are closed.